The short version
You can switch things on without guessing what will trip, and you can move in or reopen with test results, certificates, and a board that matches what is actually connected.
We’ll test what’s there, isolate what’s causing the tripping or dead circuits, then repair or renew what needs it and sign it off. You’ll finish with circuits that hold, clear test results, and paperwork you can file for insurance or a sale. If you want to go ahead, sign below and we’ll book dates.
We start by measuring, not assuming. We test circuits, track what is connected to what, and prove the fault before we open walls or replace a board. When rewiring is the right call, we separate circuits so one problem does not take out the whole place, and we test again before we hand back.
How the work runs
We keep it straightforward: test first, agree the plan, then carry out the electrical work with clean access and clear handover.
- Test and trace Day 1 Inspect the board, label what is already labelled, then test circuits for continuity, insulation resistance, polarity, and earth loop where possible. Trace mixed circuits and shared neutrals, reproduce the trip, and narrow the fault to a circuit or a section before any chasing starts.
- Agree the scope Day 1-2 Talk you through what failed and what passed, then set out the options: repair, partial rewire, or full rewire. Confirm what needs bringing up to NF C 15-100 for the work area and what can stay, then mark out any chasing routes and agree what gets made-good.
- Carry out electrical work Days 2-7 Isolate supplies, then repair or renew cabling and accessories as agreed. Install new circuits for kitchen loads, heating, and hot water, separate circuits that are currently mixed, and fit indoor or outdoor lighting and weatherproof outlets. Keep each circuit identified as it is built so testing and sign-off match what is in the walls.
- Final testing and handover Last day Test every new or altered circuit, record results, label the board, and confirm RCD and protective device operation. Walk you through what changed, what is on each circuit, and any limitations of older sections left in place, then hand over the certificates and test schedule.
Circuit schedule and labels
A labelled board and a written circuit list that matches it, so you can see what feeds sockets, lights, kitchen loads, heating, and outside points.
Electrical test results
Recorded results for the circuits we test and any circuits we alter, including insulation resistance, continuity, polarity, and protective device checks, supplied as a dated report.
Nf c 15-100 paperwork
Certificates for the electrical work carried out, issued after final testing, with the identification needed for insurance files and future sale questions.
Upgraded consumer unit or separation
Where agreed: a new or reworked board arrangement with separated circuits and correctly rated protective devices, with labelling that matches the final circuit layout.
New circuits for fixed loads
Dedicated circuits for hob/oven, kitchen sockets where required, heating and hot water loads, run in suitable cable and protection, terminated and tested at both ends.
Completed installed fittings
Installed and working sockets, switches, indoor lights, exterior lights, and weatherproof outlets that are part of the agreed works, fixed securely and left operational.
Pricing below covers the test-and-trace visit, the agreed electrical work, and final testing and paperwork.
Add-ons
These are common add-ons we can price once we’ve tested and agreed the scope.
Getting started
If you want us to hold dates and start the electrical work, this is what we need from you.
- Sign the proposal to confirm the scope of electrical work and the price.
- Pay the 30% booking deposit so we can lock in the start date.
- Confirm access details, then we’ll arrive on the agreed day and begin testing.
Payment
To book the work, you pay 30% when you sign. The remaining 70% is due when the job is finished. Every invoice is payable within 14 days of its date.
What changes. If testing shows a different fault, or you choose to add or remove circuits, we’ll write the change and its price before we carry it out, so the scope and the invoice stay matched.
Access. You’ll make sure we can reach the consumer unit, meters, and all areas we need for testing and wiring routes on each work day. If we can’t test safely, we’ll pause until access is clear.
Chasing and openings. We’ll keep openings as small as we can, but stone and plaster walls sometimes force a longer route to stay safe. We’ll tell you before we cut if a run needs a bigger chase.
Parts availability
If we find damaged cables, unsafe connections, or a board that can’t be reused, we may need extra parts. We’ll explain what failed, show you where it is, and price the fix before fitting.
Testing and sign-off. Camille Roux handles testing and certification. You’ll get the test results and NF C 15-100 paperwork at handover, after final tests pass and circuits are labelled to match the board.
Client-supplied fittings. If you supply light fittings or appliances, we’ll install what’s provided if it’s suitable and complete. If something arrives missing parts or can’t be fitted safely, we’ll stop and discuss options.
Ownership of work. Once the final invoice is paid, the installed electrical work and the paperwork are yours. Until then, anything we’ve supplied and fitted remains ours, even if it’s already on site.







