Templates / Proposal

Free Electrical Proposal Template

An electrical proposal covers the scope of electrical work, the itemised pricing, the payment terms, and sign-off deliverables like test results and certificates.

Electrical Proposal template preview

7-day free trial. No credit card required.

Use this template

Language:

en

Last updated:

October 2026

Share template

A circuit keeps tripping, half a building has gone dead, or a refit needs sign-off, and the client wants to know the fault will get proved and the fix won’t drift into endless chasing. This electrical proposal gives that job a clear order: The short version up front, then the work plan and what paperwork lands at handover, before the numbers.

The middle sections spell out what gets tested, what gets repaired or renewed, and what “finished” means, in plain language the client can check against the site. The layout uses deep plum with disciplined green accents under Zilla Slab headings, so the important bits read like labelled work, not sales copy. One line does the promise in a way clients recognise: “We start by measuring, not assuming.”

  • The short version Opens with the outcome, then explains the test-first approach and what gets signed off before any larger changes get agreed.
  • How the work runs Walks through test and trace, scope agreement, and the electrical work sequence, so the client sees how decisions get made as results come in.
  • Circuit schedule and labels Defines the labelled board, the circuit list, and the test results and NF C 15-100 paperwork handed over after final testing.
  • Pricing Lists five priced items, and the client can choose the ones that apply to the agreed scope.
  • Getting started Holds the signature and fee summary, including the 30% booking deposit step before dates get held.

The template also carries Pricing, Add-ons, and Getting started, so you replace the amounts on the priced items, send it, and the client can accept and sign online. Acceptance pairs with a fee summary and deposit step, leaving both sides looking at the same scope, the same selections, and the same payment timing.

We went from spending hours on every proposal to creating fully customized ones in under 5 minutes. That's not an exaggeration - we timed it.

Yazan & Mawaheb
Yazan & MawahebAgency Owners

What to include in an electrical proposal

PartWhat it covers

The short version

Summarises the problem, the test-first approach, and the sign-off outcome, so the client understands what gets proven before anything gets opened up or replaced.

How the work runs

Explains the sequence from testing to agreeing the plan to carrying out the electrical work, so the client knows when options get priced and confirmed.

Circuit schedule and labels

Describes the board labels, the circuit schedule, and the test results and NF C 15-100 certificates that come with the final handover.

Upgraded consumer unit or separation

Covers board changes and circuit separation where agreed, plus the kinds of fixed-load circuits and fittings that get installed and left operational.

Pricing

Carries a priced item list for the main stages of the job, so you swap in your own figures and the client can select what they’re approving.

Add-ons

Carries extra priced items that can be added after testing, so any extras stay written down and priced rather than agreed in messages.

Getting started

Carries the signature and fee summary, spelling out the accept-and-deposit step and what access details the client needs to confirm.

Payment

States the 30% deposit on signing, 70% on completion, 14-day invoice terms, and how changes, access, and chasing get handled in writing.

Parts availability

Explains how extra parts get approved and priced, who handles testing and certification, and how client-supplied fittings and ownership of work are handled.

Who it is for

Electrical contractors quoting electrical services like residential wiring, commercial electrical jobs, and solar installation work where testing and sign-off need to be clear before the price gets accepted.

The proposal in full

The short version

You can switch things on without guessing what will trip, and you can move in or reopen with test results, certificates, and a board that matches what is actually connected.

We’ll test what’s there, isolate what’s causing the tripping or dead circuits, then repair or renew what needs it and sign it off. You’ll finish with circuits that hold, clear test results, and paperwork you can file for insurance or a sale. If you want to go ahead, sign below and we’ll book dates.

We start by measuring, not assuming. We test circuits, track what is connected to what, and prove the fault before we open walls or replace a board. When rewiring is the right call, we separate circuits so one problem does not take out the whole place, and we test again before we hand back.

How the work runs

We keep it straightforward: test first, agree the plan, then carry out the electrical work with clean access and clear handover.

  1. Test and trace Day 1 Inspect the board, label what is already labelled, then test circuits for continuity, insulation resistance, polarity, and earth loop where possible. Trace mixed circuits and shared neutrals, reproduce the trip, and narrow the fault to a circuit or a section before any chasing starts.
  2. Agree the scope Day 1-2 Talk you through what failed and what passed, then set out the options: repair, partial rewire, or full rewire. Confirm what needs bringing up to NF C 15-100 for the work area and what can stay, then mark out any chasing routes and agree what gets made-good.
  3. Carry out electrical work Days 2-7 Isolate supplies, then repair or renew cabling and accessories as agreed. Install new circuits for kitchen loads, heating, and hot water, separate circuits that are currently mixed, and fit indoor or outdoor lighting and weatherproof outlets. Keep each circuit identified as it is built so testing and sign-off match what is in the walls.
  4. Final testing and handover Last day Test every new or altered circuit, record results, label the board, and confirm RCD and protective device operation. Walk you through what changed, what is on each circuit, and any limitations of older sections left in place, then hand over the certificates and test schedule.

Circuit schedule and labels

A labelled board and a written circuit list that matches it, so you can see what feeds sockets, lights, kitchen loads, heating, and outside points.

Electrical test results

Recorded results for the circuits we test and any circuits we alter, including insulation resistance, continuity, polarity, and protective device checks, supplied as a dated report.

Nf c 15-100 paperwork

Certificates for the electrical work carried out, issued after final testing, with the identification needed for insurance files and future sale questions.

Upgraded consumer unit or separation

Where agreed: a new or reworked board arrangement with separated circuits and correctly rated protective devices, with labelling that matches the final circuit layout.

New circuits for fixed loads

Dedicated circuits for hob/oven, kitchen sockets where required, heating and hot water loads, run in suitable cable and protection, terminated and tested at both ends.

Completed installed fittings

Installed and working sockets, switches, indoor lights, exterior lights, and weatherproof outlets that are part of the agreed works, fixed securely and left operational.

Pricing below covers the test-and-trace visit, the agreed electrical work, and final testing and paperwork.

Add-ons

These are common add-ons we can price once we’ve tested and agreed the scope.

Getting started

If you want us to hold dates and start the electrical work, this is what we need from you.

  1. Sign the proposal to confirm the scope of electrical work and the price.
  2. Pay the 30% booking deposit so we can lock in the start date.
  3. Confirm access details, then we’ll arrive on the agreed day and begin testing.

Payment

To book the work, you pay 30% when you sign. The remaining 70% is due when the job is finished. Every invoice is payable within 14 days of its date.

What changes. If testing shows a different fault, or you choose to add or remove circuits, we’ll write the change and its price before we carry it out, so the scope and the invoice stay matched.

Access. You’ll make sure we can reach the consumer unit, meters, and all areas we need for testing and wiring routes on each work day. If we can’t test safely, we’ll pause until access is clear.

Chasing and openings. We’ll keep openings as small as we can, but stone and plaster walls sometimes force a longer route to stay safe. We’ll tell you before we cut if a run needs a bigger chase.

Parts availability

If we find damaged cables, unsafe connections, or a board that can’t be reused, we may need extra parts. We’ll explain what failed, show you where it is, and price the fix before fitting.

Testing and sign-off. Camille Roux handles testing and certification. You’ll get the test results and NF C 15-100 paperwork at handover, after final tests pass and circuits are labelled to match the board.

Client-supplied fittings. If you supply light fittings or appliances, we’ll install what’s provided if it’s suitable and complete. If something arrives missing parts or can’t be fitted safely, we’ll stop and discuss options.

Ownership of work. Once the final invoice is paid, the installed electrical work and the paperwork are yours. Until then, anything we’ve supplied and fitted remains ours, even if it’s already on site.

Questions about this proposal template

What should an electrical proposal include?

An electrical proposal usually covers the scope of work, how the work will run, itemised pricing, payment terms, and what sign-off documents get provided. This template also calls out test results and NF C 15-100 paperwork as handover deliverables.

Do clients need test results and certificates in writing?

Clients often need written test results and certificates for insurance files, future sale questions, or compliance checks. This proposal names those deliverables up front and ties them to final testing and handover.

How do you handle changes if testing finds a different fault?

The Payment section says changes get written down and priced before the work is carried out, so the scope and the invoice stay matched. That keeps “fault finding” from turning into open-ended work without a clear approval point.

Is a deposit normal for electrical work?

A deposit is common when dates and materials need committing before work starts. This proposal states a 30% booking deposit on signing, with the remaining 70% due when the job is finished.

Can a client choose line items on an electrical quote?

Some jobs need options, like board work versus separation, or stages that depend on what testing shows. The Pricing and Add-ons sections use priced items that a client can choose from, so the accepted scope stays specific.

What payment terms should an electrical contractor put on a proposal?

Clear timing matters more than long wording: when the deposit is due, when the balance is due, and how long invoices stay payable. This template states 30% on signing, 70% on completion, and 14-day invoice terms.

Start free today

Your entire business, one login away

No credit card required. No contracts. Just the tools you need to run, grow, and automate your business with Super Work AI.

No credit card required

Plutio - Your entire business, one login away