Templates / Project

Free Interior Design Checklist Template

An interior design checklist covers the work from briefing through survey, concept, drawings, specifications, and procurement, with tasks arranged in the order they happen.

Interior Design Checklist template preview

7-day free trial. No credit card required.

Use this template

Language:

en

Last updated:

October 2026

Share template

A room gets measured, options get pinned up, and then the real worry kicks in: spending money on choices that look fine in isolation but clash once they’re in the space. This Interior Design Checklist gives the work an order you can trust, so the brief, the layout, and the finishes get decided with the same set of steps every time. The board uses a soft blush base with blue-green accents under Syne headings and Inter body text, so the next decisions stand out without the page feeling busy.

Each column holds a handful of cards, starting with Briefing and moving through the survey and existing plan, concept and layout, working drawings, and FF&E and specifications. The cards stay concrete: confirm fixed items and constraints, measure and photograph what’s there, test circulation with furniture plans, then turn the chosen direction into dimensioned plans, lighting notes, and a finish schedule that can turn into a shopping list. The last column, Procurement and handover, closes the loop with what gets issued, what questions get answered, and what goes into the handover pack.

  • Briefing Cards capture the brief, priorities, constraints, and the agreed scope, timetable, and payment terms before any design work moves forward.
  • Survey and existing plan Cards cover measuring, photographing elevations and material details, and drawing the existing plan with constraints marked.
  • Concept and layout Cards keep early decisions focused on circulation and finishes, with two moodboards and a direction sign-off step.
  • Working drawings Cards move the concept into dimensioned plans, lighting layout and switching notes, plus kitchen and bathroom layouts.
  • Procurement and handover Cards track what gets issued to the client, how builder and supplier queries get handled, and what’s included in the final walkthrough and handover pack.

Once the checklist is in Plutio, the board runs as a project where you add your own dates and assign each card to whoever’s doing the work. The columns keep the sequence clear, and the cards make it obvious what needs deciding before anything gets priced, ordered, or installed.

We went from spending hours on every proposal to creating fully customized ones in under 5 minutes. That's not an exaggeration - we timed it.

Yazan & Mawaheb
Yazan & MawahebAgency Owners

What is on this board

6 columns carrying 18 cards. Adding it builds the whole thing as a project in your workspace, with every column and card in place.

ColumnWhat is in it

Briefing

Defines the brief, priorities, and constraints, then locks in scope, timetable, and payment terms so the rest of the work has a clear frame.

  • Record project brief and priorities
  • Confirm fixed items and heritage constraints
  • Agree scope, timetable and payment terms

Survey and existing plan

Captures measurements, levels, and photos, then turns them into an existing plan with constraints marked so layout decisions stay realistic.

  • Measure every room and record levels
  • Photograph elevations and material details
  • Draw existing plan and mark constraints

Concept and layout

Moves through furniture plans, circulation options, and two moodboards, ending with a direction check so everyone knows what’s being developed.

  • Sketch furniture plans and circulation options
  • Prepare two moodboards of finishes and lighting
  • Review concepts and confirm direction

Working drawings

Builds the scaled plan, lighting layout, and key room drawings so the design can be priced, coordinated, and built.

  • Produce scaled furniture plan with dimensions
  • Create lighting layout and switching notes
  • Prepare kitchen and bathroom layout drawings

FF&E and specifications

Collects the finish schedule and FF&E choices, then turns them into a purchase-ready list with quantities before anything gets ordered.

  • Compile finish schedule for floors and walls
  • Specify FF&E, fittings and sanitaryware
  • Prepare purchase-ready shopping list and quantities

Procurement and handover

Tracks what gets issued to the client and how questions get answered, then finishes with the walkthrough and handover pack.

  • Issue specification and order lists to client
  • Answer builder and supplier queries
  • Complete final walkthrough and handover pack

What happens when you install it

  • A project is created with its board, 6 columns and 18 cards already there.
  • Nothing carries a due date, because a board holds the order the work runs in rather than a calendar. The dates go on once you know when the job starts.
  • Every card opens as a task with its own description, assignee, dates, subtasks and files, and columns are renamed, reordered or deleted like any other.

Who it is for

Interior designers and decorators running residential design or commercial interiors work, and stylists handling styling & staging who need the steps in one place before buying and ordering starts.

Questions about this project template

What should an interior design checklist include?

An interior design checklist usually covers the work in order, from briefing and site survey through concept and layout, working drawings, FF&E specifications, and procurement through handover. This board keeps each stage as a column with cards that name the specific tasks to complete before moving on.

When do you measure and draw the existing plan?

Measurements and the existing plan come early, right after briefing, because layout and furniture choices depend on real dimensions and constraints. The checklist puts those tasks in the survey and existing plan stage before any moodboards or drawings get developed.

How do you avoid buying the wrong sofa size?

Wrong-size purchases usually happen when furniture gets chosen before circulation and clearances are tested. The checklist routes decisions through concept and layout and then working drawings, so furniture plans and dimensions get checked before the shopping list is prepared.

What’s the difference between a moodboard and a specification?

A moodboard explores direction, finishes, and lighting as a concept, while a specification turns chosen items into named products, quantities, and schedules that can be ordered. The checklist separates those steps into concept and layout first, then FF&E and specifications later.

Do you need working drawings for a small interior project?

Small projects still need enough drawings and notes to avoid misunderstandings about dimensions, lighting positions, and key room layouts. The checklist includes scaled plans and lighting notes so the handoff to trades and suppliers doesn’t rely on memory or screenshots.

What happens during procurement and handover in an interior design project?

Procurement and handover covers issuing the specification and order lists, handling questions from builders and suppliers, and wrapping up with a final walkthrough and handover pack. The checklist keeps those as cards in the last column so ordering and closeout don’t get missed.

This workspace is on us. Every feature in the Suite switched on, free for 7 days, no card needed.