15% OFF ON ANY PLANUse code 15off4everClaim now →15% OFF ON ANY PLANUse code 15off4everClaim now →15% OFF ON ANY PLANUse code 15off4everClaim now →15% OFF ON ANY PLANUse code 15off4everClaim now →15% OFF ON ANY PLANUse code 15off4everClaim now →15% OFF ON ANY PLANUse code 15off4everClaim now →
Templates / Project

Free Email Marketing Calendar Template

An email marketing calendar tracks each campaign from intake through planning, production, scheduling, and sent status, so every send moves through the same checks.

Email Marketing Calendar template preview

Language:

en

Last updated:

October 2026

Share template

Launches and promos pile up fast, but email marketing still needs the same basics every time: the right segment, the right links, the right timing, and a clean exit if someone unsubscribes. The email marketing calendar gives that work a single path to move along, so a campaign doesn’t jump from a half-finished draft to a risky send because somebody lost the thread.

The board runs left to right through Onboarding, Backlog, Planning, Production, Scheduling, and Sent, which means the team can see what’s being figured out versus what’s already being built and queued. The layout uses blue‑violet accents with Poppins headings over Inter body text, so the column names read like checklist steps instead of decoration... and the brighter ochre highlight calls out the next action when a card needs attention.

  • Onboarding Capture the campaign request and get the starting details in one place before any copy or design work begins.
  • Backlog Hold campaign ideas and requests that are real, but not ready to plan or schedule yet.
  • Planning Sort out audience, goal, offer, and the checks that need to happen before production starts.
  • Production Build the email and supporting pieces, then keep revisions tied to the campaign card instead of scattered.
  • Scheduling Move campaigns that are ready to load into your ESP, add your own dates, and keep a final pre-send checkpoint.

Once the template is in Plutio, the work runs as a project board: cards move through the columns, and you add your own dates outside the board when timing matters. The only setup you need is mapping real campaigns to the flow, then keeping each send moving one step at a time.

We went from spending hours on every proposal to creating fully customized ones in under 5 minutes. That's not an exaggeration - we timed it.

Yazan & Mawaheb
Yazan & MawahebAgency Owners

What is on this board

6 columns, ready for your own cards. Adding it builds the board as a project in your workspace, with every column in place. The cards in the preview are examples of how the board is used, and are not added.

ColumnWhat is in it

Onboarding

The Onboarding column holds new requests so you can gather the details a campaign needs before it moves forward.

Backlog

The Backlog column keeps future sends and ideas visible without mixing them into active work.

Planning

The Planning column is where a campaign gets shaped into something buildable before any scheduling happens.

Production

The Production column holds campaigns while the email gets made and checked, so nothing goes out half-finished.

Scheduling

The Scheduling column is for campaigns that are ready to be queued, leaving you to add the real dates elsewhere.

Sent

The Sent column is the end of the path, keeping a record of what already went out versus what’s still in flight.

What happens when you install it

  • A project is created with its board and 6 columns, empty and ready for your own cards.
  • Every card you add opens as a task with its own description, assignee, dates, subtasks and files, and columns are renamed, reordered or deleted like any other.

Who it is for

Email marketers, growth teams, and lifecycle marketing freelancers who need a repeatable way to move campaigns from request to sent without missed checks.

Questions about this project template

What should an email marketing calendar include?

An email marketing calendar usually includes each campaign’s status, the steps it has to pass through, and where it sits right now. This board covers that workflow with columns from onboarding through sent, and you bring your own dates separately.

Is this a calendar with dates or a workflow board?

This template is a workflow board, not a dated calendar. The columns show the order of the work, and you add your own dates outside the board when you need them.

How do I stop broken links and wrong segments before a send?

Broken links and segment mistakes usually slip through when campaigns jump ahead without a final checkpoint. A staged flow helps because scheduling only happens after a campaign has passed through planning and production, leaving fewer chances to skip checks.

How do lifecycle campaigns fit into a weekly send plan?

Lifecycle campaigns still move through the same steps as broadcasts: planning, production, scheduling, and sent. The difference is volume and cadence, so the board helps by keeping lifecycle work visible without mixing it up with what must go out this week.

What does deliverability work look like inside an email plan?

Deliverability work often shows up as rules and checks attached to campaigns, like list hygiene steps and avoiding risky practices. This board gives those checks a place in the flow so they don’t get handled as last-minute side notes.

How do I manage list growth campaigns alongside promotions?

List growth campaigns compete with promos for attention, so a shared workflow helps you see what’s ready, what’s blocked, and what’s waiting. Running both through the same stages keeps the team from scheduling something that never got properly built or reviewed.

Start free today

Your entire business, one login away

No credit card required. No contracts. Just the tools you need to run, grow, and automate your business with Super Work AI.

No credit card required

Plutio - Your entire business, one login away